Files

Download

Download Full Text (114 KB)

Time Period

Pre-removal

Description

Description: Executive Summary and Section 1 of the Army Corps of Engineers Phase 1 Inspection report

Creator: Norfolk District Corps of Engineers in conjunction with Commonwealth of Virginia State Water Control Board

Date of Inspection: 14 November 1980

Report Approved: 17 February 1981

Publication Date

2-17-1981

Keywords

College Lake

Phase I Inspection Report National Dam Safety Program, November 1980

Share

COinS